Supply & Installation of Solar System for CMW TAY

 

 Supply & Installation of Solar System for CMW TAY
Pathfinder International - BHFA


IMPORTANT DATE
­­­­

Starting date of application form   30th August, 2024

Last date of application form    6th September, 2024

Category   Proposal/Quotation

Vacancy Detail


Issued on:                   August 30, 2024

Solicitation Number:   PI-BID/BHF/AUG-2024/123

For:                              Supply & Installation of Solar System for CMW TAY

Quotes Deadline:        September 06, 2024 (5:00 PM)

Background

Pathfinder International currently seeks a firm to supply the below items.

Inverex Veyron II (2500W) or comparable
2. Phonex TX-2500 (230 Am) or comparable.
3. Jinko N Type 585 B/F, or comparable
4. Complete Installation with Materials (Solar Power) Distribution Box (DC circuit breaker, wire 4mm or 6mm, depending on 20 mm wire for battery connection. Includes Distribution Box AC Circuit Breaker, SPD. MC4 connectors, Packet Rawal Plug and Screws Cable duct/PVC pipe, cable ties, and thimbles.
5.  L2 Structure Frame, 14/4
6.  Royal FAN or comparable (Desire - Smart Lifestyle, ACDC Fan)
7.  Clopal 4 Feet 40 Watt Semi-Oval LED Tube Light
8.  Transportation of Equipment Within Sindh Tando Allah Yar.

Quote Guidelines and Instructions
Please send all quotes on firm letterhead, using the Bid Submission Form found in Annex B. Quotes must be valid for at least [30] days and contain a photo of the required item.
Any deviations from the specifications should be clearly indicated on the quote.
In addition, the cover page must contain the following information:
Business name, address, phone number, and email.
Contact information.
Type of Business
Signature of Authorized Individual

Selection Criteria:
Pass/Fail: The offeror's bid must be valid for 30 days.
PASS/FAIL: Offeror must be an active taxpayer under NTN.
PASS/FAIL: The offeror must present at least two (2) copies of purchase orders/contracts of identical nature.
Offerors who match the PASS/Fail criteria will be evaluated using the following criteria.
Pathfinder will assess and evaluate quotes submitted before the deadline using the following criteria:

Criterion

Weight (%)

Price

80

Product Delivery

20

Total Weight

100

Supplier with technically compliant offer and lowest CIP cost will receive [80] points. All other bidders' scores will be reduced by 1% for each 1% increase in price above the lowest total price.
The requested item must be ready for shipment within two weeks following contract issuance. No credit will be issued for earlier availability dates. All bidders who submit a quote within the allowed range will receive [20] points. All other bidders' scores will decline by 1%.
Preference will be given to suppliers that can quote all products; nevertheless, multiple or no awards may be granted.

Payment Terms:
Payment will be made net 30 of the commercial invoice and the receipt of a Goods Receipt Note from the end user.

GST Compliance
The project is qualified for a sales tax exemption. The GST amount will be withheld, and an exemption notice will be sent within 90 days of receipt of the invoice. If the exemption letter is not received within this timeframe, the withheld GST amount will be paid at the end of the 90-day USAID compliance timeline.

Inquiries
Please send your concerns to procurement-bhfa@pathfinder.org before 3:00 PM Pakistani Time on September 3, 2024, with the subject line: PI-BID/BHF/AUG-2024/123-Supply & Installation of Solar System for CMW TAY.

Terms
Pathfinder has the right to cancel this solicitation at any time and is not obligated to issue a subcontract as a result of it.
Pathfinder will not pay any fees incurred in the development of proposal-related materials or delivery.
The resulting Purchase Order is subject to the Terms and Conditions listed in Annex A.
Thank you!
Procurement Department
Pathfinder International

 




 

Post a Comment

Previous Post Next Post